01

Start with the property

Assess usable roof, orientation, inclination, shading, condition, structure, meter and consumer-unit location, cable routes and equipment positions.

02

Check the Welsh rules

Many house-mounted installations can fall within permitted development, but listed buildings, conservation areas, flat roofs and prominent positions can require closer review.

03

Build an evidence trail

Keep the survey, design, performance estimate, permissions, network correspondence, contracts, certificates, warranties and commissioning documents together.